A Job Hazard Analysis (JHA) breaks a job into steps, lists what can hurt someone in each step, and says how the crew will prevent it. Here's how to write one your GC will accept and your crew will actually use.

What a JHA is for

A JHA (also called a JSA, job safety analysis, or AHA on federal jobs) is your plan for doing the work safely. GCs ask for one before your crew starts so they can see you've thought through the hazards of this job on this site, not a generic checklist. A good JHA is also what the foreman reviews with the crew at the start of each shift.

OSHA publishes a free guide to the method, Job Hazard Analysis (OSHA 3071). In California, identifying and correcting hazards is part of every employer's Injury and Illness Prevention Program (Title 8, §3203). Many GCs and owners make a JHA a contract requirement on top of that.

Step 1: Fill in the job information

Start with the basics the GC will check first: company, GC, job name and number, job address, the activity or work task, date, who prepared it, who reviewed it, and the competent person. Add the emergency information: the nearest hospital with an emergency room, its address and phone, and how the crew calls for help on this site.

Step 2: List the job steps in the order the work happens

Walk through the scope the way you'd explain it to the foreman: mobilize, lay out, excavate, form, place, backfill, clean up. Keep each step to one piece of work. Five to twelve steps is typical; a small job may have three. If a step has very different hazards (for example "excavate" and "set the trench box"), split it.

Use the scope of work and the proposal. Every machine, material and site condition they mention should show up in a step: work next to traffic, an occupied building, overhead power lines, a live sewer, a confined space.

Step 3: Identify the hazards in each step

For each step, ask what could hurt someone. Name the harm and the cause, so the hazard is specific:

  • Weak: "Excavator."
  • Better: "Struck by the excavator's swinging counterweight."
  • Weak: "Falls."
  • Better: "Fall from the open edge of the second-floor deck."

Think about struck-by, caught-between, falls, electrical, cave-ins, silica and other dust, noise, heat, chemicals, lifting, and the public or other trades walking into your work area.

Step 4: Write controls the crew can actually follow

For each hazard, write what the crew will do, in plain words. Follow the order safety people call the hierarchy of controls: remove the hazard if you can, then engineer it out (a trench box, guardrail, wet saw), then procedures and training, and PPE last.

  • Weak: "Follow all safety procedures."
  • Better: "Set up a swing-radius barricade; workers on foot stay outside it unless the operator lowers the bucket and gives the OK."

Name the people who are required: the competent person for excavations and scaffolds, the qualified rigger and signal person for crane picks, the certified forklift operator.

Step 5: Rate the risk

Most GCs use a Risk Assessment Code (RAC): combine how severe the injury could be (catastrophic, critical, marginal, negligible) with how likely it is (frequent, likely, occasional, seldom, unlikely) to get E (extremely high), H (high), M (moderate) or L (low). Rate each step with the controls in place, and be honest: work that depends mainly on PPE and procedures shouldn't be rated Low.

Step 6: Add equipment, training and inspections

List the equipment the job uses with the training each operator needs and the inspections required (daily equipment checks, harness inspections, scaffold inspections, trench inspections by the competent person). GCs often check this table first.

Step 7: Review it with the crew and keep it current

Go over the JHA with everyone doing the work before they start, have them sign, and keep it on site. When the work or conditions change, or after a near miss, revise it. A Daily Pre-Task Plan (also called a tailboard: a one-page sheet built from the JHA) is an easy way to review it every shift.

What GCs commonly send back

  • Generic hazards that aren't tied to this job's steps.
  • Controls like "be careful" or "use PPE" with no actual measure.
  • Missing emergency information or no competent person named.
  • Equipment in the scope that isn't in the equipment table.
  • Risk rated Low on high-hazard work.
  • Prices or contract terms pasted in from the proposal.

Make yours in minutes

Paste your scope of work and the JHA Builder writes a site-specific JHA: job steps, hazards, controls, risk ratings and Cal/OSHA and OSHA references, as a PDF ready for your GC or a Word file you can edit.

Start your 7-day free trial

Examples by trade

See short example JHAs for trenching and excavation, concrete, framing and fall protection and scaffolds, or browse all JHA examples.

Common questions

Is a JHA required by OSHA?

Federal OSHA doesn't have one rule that requires a written JHA on every construction job, but employers must find and control hazards, and many standards require planning and competent-person inspections. In California, every employer needs an Injury and Illness Prevention Program that identifies and corrects hazards (Title 8, §3203). Most GCs and owners require a written JHA in their contracts.

What's the difference between a JHA, JSA and AHA?

They're the same idea. JHA (job hazard analysis) and JSA (job safety analysis) are used on most commercial work. AHA (activity hazard analysis) is the name and format used on U.S. Army Corps of Engineers and other federal jobs under EM 385-1-1.

How long should a JHA be?

Long enough to cover every step of the scope with specific hazards and controls. A small job may fit on two pages; a large civil job can run 15 or more. Length matters less than being specific to the job.