Framing and fall protection JHA example
Falls are the leading cause of death in construction, and framing crews work at open edges every day. Your framing JHA should say exactly how workers are protected at each stage, not just "use fall protection".
What a framing JHA should spell out
- Fall protection at 6 feet on federal OSHA jobs (1926.501(b)(1)): guardrails, safety nets or personal fall arrest. California has its own rules for wood framing work (Title 8, §1716.1 and §1716.2); check which apply to your building.
- Covered and marked floor openings and stair openings, with covers that can hold the load.
- Protection before the first truss is set and before roof sheathing starts: guardrails, anchors installed from below, or a written fall protection plan where conventional protection isn't feasible. Say who checks it and when it's ready.
- A rescue plan for anyone in a harness: how they're brought down quickly, the equipment staged for it, and who does it.
- Crane picks for trusses: a qualified rigger and signal person, tag lines, and no one under the load.
- Nail guns: sequential (single-shot) triggers for most framing; saws with guards in place.
Example JHA (short version)
| Job step | Hazards | Controls | RAC |
|---|---|---|---|
| 1. Frame walls and floor systems | Fall from floor edges and openings; nail gun injuries; saw cuts | Guardrails at open edges at 6 ft+; covers on openings marked HOLE; sequential-trigger nailers; saw guards in place | H |
| 2. Stand and brace walls | Wall tipping onto workers; strains | Enough people or a wall jack for each wall; temporary braces installed before letting go | M |
| 3. Set roof trusses with a crane | Struck by a swinging truss; fall from the top plate | Qualified rigger and signal person; tag lines; nobody under the load; workers tied off to anchors set from below | H |
| 4. Roof sheathing | Fall from the roof edge or between trusses | Fall arrest anchors in place before sheathing starts; rescue equipment staged; work stops in high wind | H |